PLUMBING 101: A GUIDE TO BATHTUB INSTALLATION

Plumbing 101: A Guide to Bathtub Installation

Plumbing 101: A Guide to Bathtub Installation

Blog Article

Click Here

Just how do you feel with regards to Installing A Bathtub?


Installing A Bathtub
Mounting a tub isn't exactly rocket science, yet it does call for solid plumbing, woodworking, and in some cases, tiling skills. Changing an old bath tub with a new one is additionally a reasonably hard job. If the old bathtub is easily obtainable, the job can move quickly; if you have to open up a wall to get rid of the old tub as well as position the new tub, the job is a lot harder. In either situation, the job is within a home handyman's skills, although you will need an assistant to vacate the old bathtub and also set in the new one. Make certain you have actually certified on your own for the job and also are comfortable attempting it. As opposed to hiring a professional to take over a halfway-completed job, it is much better to think about employing one before you start. Opportunities are you may require a specialist plumber to make tube links.
This short article will certainly assist you install a brand-new bath tub in your shower room if you have currently purchased a brand-new tub and also don't require to transform the arrangement of your previous water system pipelines.
Your tools and product list should comprise the following:
  • New Bathtub

  • Hammer

  • Pipeline Wrenches

  • Prybar

  • Shatterproof glass

  • Level

  • Pliers

  • Flexible Wrench

  • Putty Knife

  • Screwdriver

  • Cold Chisel

  • Tape Measure

  • Pipeline Caps


  • Removing Old Touches


    If you require to change old faucets with new ones as a part of your installation, then the first thing you ought to do is disconnect the water system. After doing so, switch on the taps to drain any kind of water remaining in the system. The process of removing the existing taps can be fairly troublesome as a result of the limited accessibility that is often the case.
    Use a basin wrench (crowsfoot spanner) or a faucet tool to undo the nut that connects the supply pipes to the faucets. Have a towel all set for the staying water that will certainly originate from the pipes. Once the supply pipes have been eliminated, use the exact same device to loosen the nut that holds the faucets onto the bath/basin. You will certainly need to stop the solitary faucets from turning during this procedure. Once the faucets have been gotten rid of, the holes in the bath/basin will have to be cleaned up of any kind of old securing compound.
    Before carrying on to fit the brand-new faucets, contrast the pipe connections on the old faucets to the brand-new faucets. If the old taps are longer than the new taps, then a shank adapter is required for the new faucets to fit.

    Suitable New Taps


    If the tails of the brand-new faucets are plastic, then you will require a plastic adapter to prevent damage to the string. One end of the connector fits on the plastic tail of the faucet and also the various other end gives a connection to the existent supply pipes.
    If you need to fit a monobloc, then you will certainly call for reducing couplers, which links the 10mm pipe of the monobloc to the conventional 15mm supply pipeline.
    Next off, position the tap in the installing opening in the bath/basin guaranteeing that the washers remain in location in between the tap as well as the sink. Protect the tap in place with the producer supplied backnut. As soon as the tap is securely in position, the supply pipelines can be attached to the tails of the faucets. The taps can either be connected by utilizing corrugated copper piping or with normal tap adapters. The former type ought to be linked to the tap ends first, tightening only by hand. The supply pipelines can later on be linked to the other end. Tighten both ends with a spanner after both ends have been linked.

    Setting up the Tub


    Utilizing the two wooden boards under its feet, position the bath tub in the needed setting. The wooden boards are helpful in equally spreading out the weight of the tub over the area of the boards as opposed to concentrating all the weight onto four tiny points.
    The following goal is to make certain that the tub is leveled all round. This can be achieved by inspecting the level as well as readjusting the feet on the bathtub till the spirit level checks out degree.
    To install faucets, fit all-time low of the outermost adaptable tap connector to the appropriate supply pipeline by making a compression sign up with; then do the same for the other tap.
    Activate the water system and examine all joints as well as brand-new pipework for leaks and also tighten them if needed. Load the tub as well as also check the overflow outlet and also the normal outlet for leaks.
    Ultimately, take care of the bathroom paneling as explained in the supplier's user's manual. Tiling and sealing around the tub needs to wait till the bath tub has actually been used at least when as this will resolve it into its last setting.

    Preparing for the Installment


    First of all, the sustaining framework provided with the bath must be fitted (if required) according to the maker's instructions. Next, fit the faucets or mixer to the bath tub. When fitting the tap block, it is necessary to make sure that if the tap comes with a plastic washing machine, it is fitted between the bath as well as the faucets. On a plastic bath, it is likewise practical to fit a sustaining plate under the faucets device to stop pressure on the bath tub.
    Fit the adaptable faucet adapters to the bottom of both faucets utilizing 2 nuts as well as olives (often supplied with the tub). Fit the plug-hole outlet by smearing mastic filler round the sink electrical outlet opening, and after that pass the outlet via the hole in the bathroom. Use the nut provided by the supplier to fit the plug-hole. Take a look at the plug-hole outlet for an inlet on the side for the overflow pipeline.
    Next, fit completion of the versatile overflow pipe to the overflow electrical outlet. After that, screw the pipeline to the overflow face which should be fitted inside the bathroom. Make sure you utilize every one of the supplied washing machines.
    Attach the trap to the bottom of the waste electrical outlet on the bath tub by winding the thread of the waste outlet with silicone mastic or PTFE tape, and also screw on the catch to the outlet. Link all-time low of the overflow tube in a comparable manner.The bathroom should now prepare to be fitted in its last setting.

    Tiling Around the Bath tub


    In the location where the bathroom fulfills the floor tile, it is essential to secure the accompanies a silicone rubber caulking. This is very important as the installation can relocate enough to crack a rigid seal, causing the water to permeate the wall in between the bathroom and the tiling, causing issues with dampness and also feasible leaks to the ceiling below.
    You can choose from a variety of coloured sealers to assimilate your components and also fittings. They are offered in tubes and cartridges, as well as can sealing voids up to a width of 3mm (1/8 inch). If you have a larger gap to fill, you can load it with twists of soaked newspaper or soft rope. Remember to always load the bathtub with water before sealing, to allow for the activity experienced when the bathtub remains in usage. The sealant can crack fairly early if you do not consider this activity before securing.
    Alternatively, ceramic coving or quadrant ceramic tiles can be made use of to border the bathroom or shower tray. Plastic strips of coving, which are easy to use and also reduce to size, are also conveniently readily available on the marketplace. It is advisable to fit the tiles utilizing waterproof or water-proof adhesive as well as grout.

    A Step-by-Step Guide to Installing a Bathtub


    Is your bathtub looking a bit dated lately? Believe it or not, installing a new one is a project you can do yourself. Whether your bathtub is broken or doesn’t fit in with your current bathroom’s design, you can fix it without having to hire a contractor or paying labour costs.



    But, beyond saving money, there are other benefits of installing your own bathtub. When you do this project yourself, you can customise every step of the process. You can also make sure the finished product looks exactly the way you want it to.



    This DIY project is quite involved, but by doing some research, preparing your bathroom and using the right equipment, it is definitely one you can take on. This guide will help you understand the technical procedures behind installing a new bathtub.


    Remove the Existing Bathtub


    To remove the old bathtub, you will need to turn the water supply off before you start any work. After you turn the water off, there will likely still be some water left in your plumbing system, which you can remove by turning on a faucet below the level of the bathtub. Once the water stops running, you are ready to start working.



    The easiest way to remove the tub is to remove the faucet, handles and other piping and then pull the tub out from the wall. If this doesn’t work in your situation, you will need to remove part of the wall, remove the piping and then slide the tub out.


    Choose the Right Bathtub


    The ideal way to replace your bathtub is to find one that has the exact dimensions and has the drain and faucet on the same side as your old one. This way, it will fit in the same place and you won’t have to change the piping system in your bathroom. Choose a tub that matches your home’s decor and fits with the style of the bathroom.


    Install the Plumbing and Ledger Board


    You can purchase a tub drain kit at a hardware store which will have all the pieces you will need for your new tub’s plumbing. Follow the instructions that came with the kit to install the plumbing in the new tub and then take measurements to make sure the plumbing in the tub will align with the plumbing in your bathroom. If it doesn’t, now is the time to make necessary adjustments.



    Some bathtubs need a ledger board that is installed on the wall behind the tub to help support it. If your new bathtub requires one, the directions that came with it will tell you how high it should be installed. If your old bathtub had a ledger board, and it is still in good condition, you can adjust its height to match the new bathtub.


    Install the Bathtub


    When the plumbing and ledger board are ready, you can install the new bathtub. Carefully lower it into the space, being careful not to damage the tub, wall, plumbing or ledger board. Since bathtubs are very heavy and you will need to line the tub up exactly, it is wise to have someone help you with this step.



    Once the tub is in place, it needs to be perfectly level, so use a bubble level instead of estimating how level the tub is. Put the level on the top edge of the tub, not the bottom on the inside, since many tubs are designed with a sloped bottom.



    If the bathtub isn’t level, adjust the ledger board and shift the tub until it is. When it is level, use screws to attach the tub to the wall studs. Most bathtubs have pre-drilled holes in the upper flange, so use these but do not over tighten the screws.


    Hook up the Plumbing


    Now that the bathtub is installed, it needs to be attached to your plumbing system. First, install the shoe fitting under the tub and drain pipe, then the overflow pipe and then the drain flange. Your tub plumbing kit will include specific instructions on how to install these pieces.


    Install the Bathtub Surround


    A bathtub surround will protect the walls around the tub from water damage and can give your new bathtub a more finished look. To install one, make sure the wall is completely clean and dry so that the adhesive will be able to hold the surround securely. Then, measure the surround and mark the same dimensions on the wall above the tub.



    Following the directions that came with the surround adhesive, apply it to the wall. Press the surround against the wall on top of the adhesive and then pull it away for about three minutes to activate the adhesive, then apply the surround again. Keep in mind that this is the most common way to use an adhesive, but you should check the instructions on the package for any special steps.



    If there is any excessive adhesive around the sides of the surround, you can use mineral spirits to remove it. Then use masking tape to hold the surround panels in place until the adhesive is dry. Using silicone, seal all the cracks between the surround panels and the gap between the bottom of the panels and the top of the bathtub.



    If you want to install tile above your bathtub, instead of a bathtub surround, the process will be very similar. But, you will need to measure and cut tiles and install each one individually, using tile spacers to make sure they are evenly spaced. You will then use grout to fill in the spaces between the tiles.

    https://www.hss.com/blog/bathroom/a-step-by-step-guide-to-installing-a-bathtub/


    Tools You Need to Install a New Bathtub

    Do you like reading about Tools You Need to Install a New Bathtub ? Make feedback further down. We'd be pleased to hear your suggestions about this write up. Hoping that you visit us again in the near future. Liked our write up? Please share it. Help another person locate it. I enjoy reading our article about A Step-by-Step Guide to Installing a Bathtub.


    Call Us Now

    Report this page